Phase 2 A

New Home Construction
Phase 2A - Floor Deck & Rough Framing

Phase 2 A

Phase 2 A –Floor Deck & Rough Framing

The floor deck was constructed after the installation of steel support beams to carry the load of the main floor. The new home began to take shape with the rough framing of exterior and interior walls. All exterior walls were covered with Tyvek™, an air semi-permeable waterproof membrane.


Spectrum New Home Build Project
New Home Build